NEW DELHI: Union Minister for Road Transport, Highways and MSMEs Nitin Gadkari inaugurated and laid the foundation stones for 45 highway projects for the State of Madhya Pradesh through video conference.
Madhya Pradesh Chief Minister Shivraj Singh Chauhan presided over the virtual function, attended by Union Ministers Thavarchand Gehlot and Narendra Singh Tomar, MoSs Prahlad Singh Patel, Faggan Singh Kulaste and Gen (Dr) V K Singh (Retd), Ministers from the State, several MPs, MLAs and senior officers from the Centre and the State.
These projects for inauguration and foundation laying carry a Road length of 1361 kilometers, involving construction value of Rs 11427 crore. Paving the way for development of MP, these roads will enhance better connectivity, convenience and economic growth in and around the State.
Movement of people and goods to and from the State of Madhya Pradesh will also improve substantially especially with the neighbouring States of Rajasthan, Uttar Pradesh, Chhattisgarh etc. The better roads lead to savings in time and fuel and as well lower emission of pollutants. Further these project will decongest roads and the enroute towns contributing to improved road experience.
(1) आज मध्य प्रदेश के इतिहास में प्रगति और विकास का एक स्वर्णिम क्षण है। राज्य में सड़क नेटवर्क को मजबूती देने के लिए 45 सड़क परियोजनाओं का मध्य प्रदेश के मुख्यमंत्री श्री @ChouhanShivraj जी, परिवहन राज्यमंत्री जी, @Gen_VKSingh pic.twitter.com/tTHl6UTzaf
— Nitin Gadkari (@nitin_gadkari) August 25, 2020
Speaking on the occasion, Gadkari said, the NH length in the State is 13,248 kms today, which was barely 5,186 kms in the year 2014. He said, Rs 1,25,000 crore worth of development works are underway in Madhya Pradesh. As much as 60 to 70 per cent works have been completed on approx. Rs 30,000 crore worth road works in the State. He said, several of these roads are important for providing connectivity to the tourist spots and backward areas of the State. The Minister announced that by the year 2023, development works worth Rs 50,000 crore are targeted for completion.
(2) …सामाजिक न्याय और अधिकारिता मंत्री श्री @TCGEHLOT जी, ग्रामीण विकास मंत्री श्री @nstomar जी, पर्यटन और संस्कृति राज्य मंत्री श्री Prahlad Singh Patel जी, इस्पात राज्यमंत्री श्री @fskulaste जी और अन्य गणमान्यों की उपस्थिति में… pic.twitter.com/dInnvGNLAd
— Nitin Gadkari (@nitin_gadkari) August 25, 2020
The Minister further informed that work has already started on the 1260 km eight lane access controlled Delhi-Mumbai Expressway, of which 244 km 8-lane length will be constructed in Madhya Pradesh at a cost of Rs 8,214 crore. He said, the work has already been awarded for the MP section of this Expressway, which will pass through Ramganj Mandi, Garoth, Jawra and Ratlam areas of Malwa region, and Thandla (Jhabua). He said, a 173 km long 4-lane road will be made to provide connectivity to the Malwa region from the Delhi-Mumbai Expressway. This will pass through Indore, Dewas, Ujjain, Agar to Garoth, and the works will be awarded by December this year.
(3) …विडियो कॉन्फ्रेंसिंग के माध्यम से शिलान्यास एवं लोकार्पण किया। साथ ही नये परियोजनाओं की घोषणा कर सभी से साझा किया। #PragatiKaHighway pic.twitter.com/GJpqS54jOf
— Nitin Gadkari (@nitin_gadkari) August 25, 2020
Gadkari asked the CM to quickly grant State Government permission for mining, as it has direct bearing on the speed of Expressway construction. He also requested the CM to urgently distribute the land acquisition money to farmers, which the NHAI has already sent to the State government. *Shri Gadkari also asked for expediting forest clearance which requested CM to review himself as unduly holding up clearance delays projects and the same is not in public interest.
(4) 11,427 करोड़ कुल लागत और 1361 कि.मी. कुल लंबाई की यह सड़क परियोजनाएं मध्य प्रदेश के पर्यटन और पिछड़े क्षेत्र के विकास में महत्वपूर्ण योगदान करेगी। इन सड़क परियोजनाओं के पूर्ण होते ही मध्य प्रदेश में सड़क नेटवर्क मजबूत होगा। #PragatiKaHighway pic.twitter.com/sdizqhbNt9
— Nitin Gadkari (@nitin_gadkari) August 25, 2020
The Minister highlighted the role of MSME sector in improving the employment and economic scenario in Madhya Pradesh. Informing about the recent expansion in the definition of MSME units, he exhorted the CM to utilise the opportunity and explore export potential of handicrafts, handloom, etc which can provide employment to large number of people. *This he said will also help in the progress of Madhya Pradesh.*
Gadkari also announced Rs 700 crore from Central Road Fund(CRF) for Madhya Pradesh to be utilised in the road sector. Inviting He proposals from the State, he said Rs 350 crore worth of proposals may include the proposals from MPs of Madhya Pradesh for road works in their constituency.
(5) आर्थिक एवं सामाजिक विकास में तेजी आएगी और राज्य संपन्न एवं समृद्ध होगा। प्रधानमंत्री श्री @narendramodi जी और मुख्यमंत्री श्री शिवराज सिंह चौहान जी के नेतृत्व में हम मध्य प्रदेश के विकास के लिए कटिबद्ध है। #PragatiKaHighway pic.twitter.com/hXScmNPM2E
— Nitin Gadkari (@nitin_gadkari) August 25, 2020
Chief Minister Chauhan complemented the Union Minister for his vision and willingness to undertake important Road projects in the State. He said, these roads are blessings for MP as they not only save time and money, but also protect life with reduced accidents. Assuring full cooperation from State machinery, he requested the Union Minister to take up three ambitious Road projects of Madhya Pradesh – Narmada Expressway, Chambal Expressway (also called Atal Progressway), and the Ram Vangaman Path. He said, he will very soon submit detailed reports on these projects to the Centre.
Union Ministers Thavarchand Gehlot, Narendra Singh Tomar, Prahlad Singh Patel and Faggan Singh Kulaste along with other dignitaries also applauded the work and initiatives taken for various highways projects in MP.
The details of projects which were inaugurated and of those foundation stones of which were laid today are as below :
S. No. | Name of the Projects | Length (in Km.) | Sanction Cost (Rs.in Cr.) |
Projects ready for Bhoomipujan | |||
1 | Construction of 4 lane ROB at km 14+800 (Jerai) on Katin -Beena section of NH-934 | ROB | 77.26 |
2 | Construction of 2 -lane ROB at Km 36+800 (Jarua) on Sagar -Khuraj-Bina section of NH-934 | ROB | 66.49 |
3 | Construction of Major Bridge at Betwa River (436 mtr) at km. 81/2 on NH-539 | Bridge | 24.66 |
4 | Construction of High level Bridge across Kshipra River at Km 20/2 on Indore Betul section of NH-47 | Bridge | 9.36 |
5 | Reconstruction of 6 nos. submersible/ narrow/ distressed bridges on Jabalpur-Dinori section of NH-45 Ext. | Bridge | 26.02 |
6 | Strengthening work in km. 1/550 to 23 of Indore – Betul Road on NH-47 | 22.6 | 14.03 |
7 | Strengthening work in km. 32 to 35 of Ambua to Dahod on NH-56 | 4 | 2.58 |
8 | Strengthening work in km. 41 to 55 of Gulganj-Amanganj-Pawai-Katni Road on NH-43 Ext | 15 | 6.58 |
9 | Strengthening work in km. 82=1, 101 to 103=3, 106=1, 112=1, 120 to 122=3, 124 to 134=11, 135 to 145= 11, 163 to 164=2, 167= 1, 182 to 183=2, 188= 1, & 220 to 222.400= 3.400 ( Tikamgarh- Prathvipur – Orchha Road) on NH-539 | 40.4 | 16.73 |
10 | Strengthening work in km. 1, 2, 5 to 10, 13,14,18,20,26 to 33, 77 to 85, 96 to 98, 162 to 195 of Dinara- Pichhor Road on NH-346 | 68 | 33.27 |
11 | Strengthening work in km.115, 122, 127, 128, 136 to 148, 159, 182, 183, 188, 201 of Sawai Madhopur-Sheopur-Goras-Shyampur Road on NH-552 Extn. | 22 | 11.02 |
12 | 4L of Nanasa to Pidgaon from Km 95.000 to 142.445 of Indore – Harda Section of NH-47 | 47.445 | 866.64 |
13 | 4L of Harda to Temgaon from Km 0.000 to 30.000 of Harda-Betul Section of NH-47 | 30 | 555 |
14 | 4L of Chicholi to Betul from km 81.00 to km 121.248 of Harda-Betul section of NH-47 | 40.25 | 620.36 |
15 | 4-laning of Katni Bypass section of NH-30 | 20 | 194.4 |
16 | Banmor- Shanichara Mandir road under CRIF scheme | 12.66 | 19.92 |
17 | Shanichara Mandir- Bateshwar Padavali Rithora road under CRIF scheme | 9.8 | 13.36 |
18 | Kheda Ajnoda Kutwar – Bichola Rithora road under CRIF scheme | 13.76 | 22.19 |
19 | Pichhore Dinara road to Village Mijaura- Chanderi-Pichhor road via Chandu Pahadi, Manka, Kachhowa, Gadroli, Khurai, Jungipur, Bhitargawan, Manpur road under CRIF scheme | 23.00 | 29.62 |
Sub Total (Bhoomipujan) | 369 | 2609 | |
Projects ready for Inauguration | |||
20 | 2L+PS from Km 81 to 175 of Sanchi-Sagar section of NH-146 | 94.64 | 287.34 |
21 |
|
Bridge | 16.68 |
22 | Balance work of 2 L+PS of Bhopal-Sanchi Section of NH-146 | 53.775 | 304.58 |
23 | Reconstruction of 29 nos. Culverts and Minor bridges between Km. 3/8 to 87 Sagar- Chattarpur –MP/UP Border section of NH-34 | Bridge | 39.73 |
24 | 2L+PS from Km 131 to 189/4 of Sagar- Chattarpur section of NH-34 | 57.42 | 178.23 |
25 | Construction of HL Bridges at Km. 188/4 on Chattarpur-UP Borader section of NH-34 | Bridge | 8.58 |
26 | 2L+PS from Km 0.00 to 36.71 of Rewa-Sirmour section of NH-135B | 36.71 | 162.56 |
27 | 2L+ PS from Km 5.500 to Km 22.910 (Khilchipur Jirapur section of newly declared NH-752B | 25.18 | 101.61 |
28 | Strengthening work in km. 0 to 3200 Biaora Maksudangarh Road on New NH 752B | 3.2 | 1.64 |
29 | Strengthening work in km. 34.560 to 36 of Anjad – Thikari Road on NH-347B | 1.44 | 0.91 |
30 | Strengthening work in km.20 to 22 of (Jabalpur-Kundum-Shahpura-Dindori Road) & Km. 194, 195, 219, 220 of Sagar Tola – Kabir chabutra stretch on NH- 45 Extn. | 7.6 | 3.31 |
31 | 4L of Rewa to Maihar section of NH-30 (Package-I) | 69.19 | 1032.29 |
32 | 4L of Maihar to Katni and Katni to Sleemnabad section of NH-30 (Package-II) | 69.07 | 1034.11 |
33 | 4L of Sleemnabad to Jabalpur section of NH-30 (Package-IV) | 68.26 | 1035.15 |
34 | 4L of Jabalpur – Lakhnadon section of NH-30 & NH-34 | 80.82 | 1244.43 |
35 | 4L of Biaora – Pachore- Sarangpur- Shajapur- Makshi- Dewas Section of NH-52 | 141.26 | 1583.79 |
36 | 4L of Lalghati to Mubarakpur (Pkg-I) of Bhopal-Biaora Section of NH-46 | 8.275 | 374.4 |
37 | 4L of Nayagaon to Satanwarda of Gwalior-Shivpuri Section of NH-46 | 97 | 1055 |
38 | 4L of existing road from km 169/6 to km 173/ 6 (Mohana Town Portion) of Gwalior- Shivpuri Section of NH-46 | 3.2 | 22.89 |
39 | 4L of existing road from Simariya Tekri to Haripura Tiraha road from Km. 41/8 to Km. 50/10 of NH-44 at Dabra Town and Jaurasi Mandir approach Road from Km. 22/4 to Km. 23/6 of NH-44 | 10.3 | 56.09 |
40 | Narsingpur-Kerpani-Sarsala road under CRIF scheme | 18.6 | 36.00 |
41 | Shivpuri loop marg- Sheetla Mata Chinor road under CRIF scheme | 53.2 | 85.12 |
42 | Makoda-Chhimak-Bagwai-Kariyawati-Shankhni-Dhumeshwar-Badgaur road under CRIF scheme | 44.9 | 69.00 |
43 | Pagara-Karonda-Piroda-Khurd-Bhootmadi-Rusalla-Khamkhera road under CRIF scheme | 35.08 | 29.22 |
44 | Barlai Jagir Mundla Husain Dhankhedi phata to Dhankhedi Jaitpur Dharmpuri road (Major District road 45-32) under CRIF scheme | 13.06 | 15.65 |
45 | Construction of 2 -lane ROB at Betoli fatak Ganj Basoda Railway crossing no. 288 in Vidisha District under CRIF scheme | ROB | 40.00 |
Sub Total (Inauguration) | 992 | 8818 | |
Grand Total | 1361 | 11427 |